This design build project upgraded the Boundary Channel Drive at I-395 interchange and provided bicycle and pedestrian improvements in the area.
The project included reducing underutilized roadway capacity on Boundary Channel Drive in order to construct a 12-foot-wide westbound shared-use path and an eight-foot-wide eastbound sidewalk. The half-mile shared-use path creates a new link from the Mount Vernon Trail to the Pentagon and Long Bridge Park by tying into the existing path that parallels the southbound George Washington Memorial Parkway ramp to southbound I-395.
Other project improvements included:
Virginia Department of Transportation (VDOT)
Arlington County
Northern Virginia Transportation Authority
Shirley Contracting Co.
Arlington, VA
September 2022 to May 2024
Copyright © 2025 Dulles Engineering, Inc. - All Rights Reserved.
Dulles Engineering, Inc. ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Ali Dar at phone number 571-521-9434 or email ali.dar@dullesengineers.com.
DESIGNED BY DE